top of page
Nutrien Thickener Center-Well Structural Steel Stiffening and Refurbishment- 2021
Scope: Fabrication and install of all structural pieces outlined in the drawings including all welding, painting touch ups and miscellaneous pieces needed for the install. Provided fabrication drawings.
Project schedule duration: 3 Months
.
bottom of page